Byford Tavern WA

Project Manager Consultant

Engaged to finalise the project and to have operating without power services. Project had contractual constraints and power needed to supplied to limit these losses.

Installed 2 generators, one for use in the facility and the other generator was Installed for back up reasons so there was no loss of stock which inturn met our contractual obligation.

  • Installation of generator so tavern could be operational
  • Manage all finals of trades and their contracts
  • Quality sign off
  • Handover to client